{"id":1168,"date":"2026-05-26T11:09:59","date_gmt":"2026-05-26T11:09:59","guid":{"rendered":"https:\/\/craftec.vn\/?page_id=1168"},"modified":"2026-05-26T11:09:59","modified_gmt":"2026-05-26T11:09:59","slug":"restoration","status":"publish","type":"page","link":"https:\/\/craftec.vn\/en\/service\/restoration\/","title":{"rendered":"Office recovery &#038; Relocation"},"content":{"rendered":"<section class=\"clearfix\">\n<div class=\"u_sv_flex\">\n<div class=\"u_sv_info\">\n<div class=\"u_sv_info_ttl\">\n<p>Office recovery<\/p>\n<\/div>\n<div class=\"u_sv_info_des\">\n<p>Whether office recovery is required during an office relocation has a significant impact on the overall timeline. In some cases, the building management designates a specific contractor for the restoration, while in others, tenants are allowed to choose their own.<\/p>\n<p><span class=\"bold\">\uff11\uff09In case of carrying out by the building\u2019s designated contractor<\/span><br \/>\nWhen the office recovery is carried out by the building\u2019s designated contractor, the cost may be higher.<\/p>\n<p><span class=\"bold\">\uff12\uff09In case tenants are free to select their own contractor without building requirements<\/span><br \/>\nAlthough it is necessary to manage the schedule carefully \u2014 including prior confirmation of building regulations and construction inspections up to the handover \u2014 tenants can compare and select contractors based on pricing.<\/p>\n<p>Restoration requirements are a key consideration that should always be confirmed before moving into a new office space. For instance, companies that occupy pre-fitted offices are often required to fully remove all interiors and restore the space to its original condition upon departure. To avoid unexpected costs or delays, it\u2019s essential to review all move-out and restoration terms carefully before signing the lease.<\/p>\n<\/div>\n<\/div>\n<div class=\"u_sv_img\">\n<p><img decoding=\"async\" src=\"https:\/\/craftec.vn\/wp-content\/themes\/craftec\/images\/service_img05.jpg\" alt=\"Office recovery \" width=\"500\" \/><\/p>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"clearfix\">\n<div class=\"u_sv_flex\">\n<div class=\"u_sv_info\">\n<div class=\"u_sv_info_ttl\">\n<p>Relocation<\/p>\n<\/div>\n<div class=\"u_sv_info_des\">\n<p>At CRAFTEC, we support our clients from the very first stage of preparing for an office relocation. Every detail \u2014 from numbering desks and seating positions to defining carton labeling and packing rules \u2014 is carefully coordinated with your in-house team in Vietnam.<\/p>\n<p>Choosing a local mover based solely on low cost can lead to serious risks, such as delays in pickup, careless handling of furniture, or scratches and damage to your newly finished office.<\/p>\n<p>The ideal timing for relocation is typically Friday evening through the weekend, allowing your team to start work smoothly in the new office on Monday morning.<\/p>\n<p>CRAFTEC offers a comprehensive one-stop service \u2014 including interior construction, office relocation, and reinstatement \u2014 ensuring a smooth, efficient, and worry-free moving experience.<\/p>\n<\/div>\n<\/div>\n<div class=\"u_sv_img\">\n<p><img decoding=\"async\" src=\"https:\/\/craftec.vn\/wp-content\/themes\/craftec\/images\/service_img06.jpg\" alt=\"\u539f\u72b6\u56de\u5fa9\u5de5\u4e8b\" width=\"500\" \/><\/p>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"clearfix\">\n<div class=\"u_step\">\n<div class=\"u_step_flex\">\n<div class=\"u_step_left\">\n<h3 class=\"u_sec_ttl\"><span class=\"ja\">Office<br \/>\nrecovery&amp;<br \/>\nrelocation<\/span><span class=\"en\">FLOW<\/span><\/h3>\n<\/div>\n<div class=\"u_step_right\">\n<div class=\"u_step_list\">\n<div class=\"u_step_row\">\n<div class=\"u_step_box\">\n<div class=\"u_step_icon\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/craftec.vn\/wp-content\/themes\/craftec\/images\/mail_step.png\" alt=\"Inquiry and consultation\" width=\"22\" height=\"18\" \/><\/p>\n<\/div>\n<div class=\"u_step_info\">\n<div class=\"u_step_number\">\n<p>STEP, 1<\/p>\n<\/div>\n<div class=\"u_step_ttl\">\n<p>Inquiry and<br \/>\nconsultation<\/p>\n<\/div>\n<div class=\"u_step_des\">\n<div class=\"u_step_des_box\">\n<p>We will inquire about the return deadline for the current tenant space and the schedule for the relocation work, and coordinate the overall timeline.<\/p>\n<p class=\"u_btn_mail\"><a href=\"https:\/\/craftec.vn\/contact\/\">Request<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"u_step_row\">\n<div class=\"u_step_box\">\n<div class=\"u_step_icon\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/craftec.vn\/wp-content\/themes\/craftec\/images\/u_look.png\" alt=\"On-site survey \/ Quotation\" width=\"24\" height=\"18\" \/><\/p>\n<\/div>\n<div class=\"u_step_info\">\n<div class=\"u_step_number\">\n<p>STEP, 2<\/p>\n<\/div>\n<div class=\"u_step_ttl\">\n<p>On-site survey \/ Quotation<\/p>\n<\/div>\n<div class=\"u_step_des\">\n<div class=\"u_step_des_box\">\n<p class=\"bold u_step_des_box_ttl\">Review and confirmation of moving conditions<\/p>\n<p>We will investigate the building regulations regarding move-out and move-in for both the current and new properties, and confirm whether the overall relocation schedule is feasible. Additionally, we will review the details regarding the reuse of OA equipment, furniture, and chairs, and provide a quotation.<\/p>\n<p>If there is a network service provider involved, we will also confirm in advance the scope of equipment to be moved and the details of reinstallation.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"u_step_row\">\n<div class=\"u_step_box\">\n<div class=\"u_step_icon\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/craftec.vn\/wp-content\/themes\/craftec\/images\/create_icon.png\" alt=\"Relocation and New Office Opening\" width=\"21\" height=\"21\" \/><\/p>\n<\/div>\n<div class=\"u_step_info\">\n<div class=\"u_step_number\">\n<p>STEP, 3<\/p>\n<\/div>\n<div class=\"u_step_ttl\">\n<p>Relocation and New Office Opening<\/p>\n<\/div>\n<div class=\"u_step_des\">\n<div class=\"u_step_des_box\">\n<p>Typically, packing of reusable office furniture and equipment begins on Friday evening. About a week before the move, cardboard boxes and packing materials are delivered, and the client is expected to finish packing documents and personal items by the moving day. Reusable PCs, furniture, and fixtures are packed by CRAFTEC staff on the day of the move.<br \/>\nThe relocation itself takes place from Friday night through Saturday, with setup of reusable furniture and equipment completed on Sunday. On Monday morning, the client\u2019s staff organize their workstations and connect their PCs, so regular operations can resume smoothly by Monday morning.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"u_step_row\">\n<div class=\"u_step_box\">\n<div class=\"u_step_icon\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/craftec.vn\/wp-content\/themes\/craftec\/images\/bat_icon.png\" alt=\"Start of property restoration works\" width=\"24\" height=\"16\" \/><\/p>\n<\/div>\n<div class=\"u_step_info\">\n<div class=\"u_step_number\">\n<p>STEP, 4<\/p>\n<\/div>\n<div class=\"u_step_ttl\">\n<p>Start of property restoration works<\/p>\n<\/div>\n<div class=\"u_step_des\">\n<div class=\"u_step_des_box\">\n<p>After moving out items from the old office, the property restoration work will commence. Typically, the office recovery period is as follows:<br \/>\nLess than 100 m\u00b2: about 1 week<br \/>\nLess than 300 m\u00b2: about 2 weeks<br \/>\nLarger spaces: around 3 weeks<br \/>\nIn the early planning stage, we will review the building\u2019s construction regulations and restoration requirements, and finalize the schedule accordingly.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"u_step_row\">\n<div class=\"u_step_box\">\n<div class=\"u_step_icon\">\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/craftec.vn\/wp-content\/themes\/craftec\/images\/heart_icon.png\" alt=\"Completion of restoration work and timely handover of the former tenant space\" width=\"25\" height=\"19\" \/><\/p>\n<\/div>\n<div class=\"u_step_info\">\n<div class=\"u_step_number\">\n<p>STEP, 5<\/p>\n<\/div>\n<div class=\"u_step_ttl\">\n<p>Completion of restoration work and timely handover of the former tenant space<\/p>\n<\/div>\n<div class=\"u_step_des\">\n<div class=\"u_step_des_box\">\n<p>After the completion of the restoration work, CRAFTEC, the building management, and the client will conduct an on-site inspection to verify the restoration status. The keys are returned, and the necessary documents prepared by the building management are signed, marking the completion of the restoration work.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"clearfix\">\n<div class=\"u_case_post_other mb70\">\n<div class=\"u_case_post_other_ttl\">\n<h3 class=\"u_sec_ttl\"><span class=\"ja\">List of case<\/span><span class=\"en\">Case<\/span><\/h3>\n<div class=\"u_sec_ttl_case_sub\">\n<p>Office Relocation Case Including Restoration Work<\/p>\n<\/div>\n<\/div>\n<div class=\"u_case_post_other_content\">    <div class=\"u_case_post_other_list\">\n        <div class=\"sec02\">\n            <div class=\"s2_list\">\n                                        <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/persol-career-tech-studio\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2026\/04\/DS06105-scaled.jpg\" alt=\"Transitioning to a Communication-Driven Workspace: PERSOL CAREER TECH STUDIO\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/persol-career-tech-studio\/\">Transitioning to a Communication-Driven Workspace: PERSOL CAREER TECH STUDIO<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>In the initial presentation for the two-company Japanese interior design competition, our design unfortunately did not match the client's intentions.\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/05\/05<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>\u30bb\u30ad\u30e5\u30ea\u30c6\u30a3<\/p><p>\u30cd\u30c3\u30c8\u30ef\u30fc\u30af<\/p><p>Office interior<\/p><p>Relocation<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/geo-vietnam-office-relocation\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2025\/11\/2-scaled.jpg\" alt=\"GEO System Solutions Vietnam: The Vietnam Base Office Attracting Attention Across the Group\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/geo-vietnam-office-relocation\/\">GEO System Solutions Vietnam: The Vietnam Base Office Attracting Attention Across the Group<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>The new office on the 10th floor of Alpher Tower has been attracting attention from various group companies within the\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/05\/05<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>\u30bb\u30ad\u30e5\u30ea\u30c6\u30a3<\/p><p>\u30cd\u30c3\u30c8\u30ef\u30fc\u30af<\/p><p>Office interior<\/p><p>Relocation<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/2nd-street-geo-system-solutions\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2026\/04\/IMG_5656-1-scaled.jpg\" alt=\"GEO SYSTEM SOLUTIONS VIETNAM: 2nd STREET Mock Store Installed Inside Office\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/2nd-street-geo-system-solutions\/\">GEO SYSTEM SOLUTIONS VIETNAM: 2nd STREET Mock Store Installed Inside Office<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>GEO SYSTEM SOLUTIONS VIETNAM, whose core business is supporting various companies within Japan\u2019s GEO Group, has developed a new satellite\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/04\/23<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>Office interior<\/p><p>Store interior<\/p><p>Others<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/residential-renovation-in-aqua-1\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2026\/04\/001_LDK-scaled.jpg\" alt=\"Residential Renovation in AQUA 1\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/residential-renovation-in-aqua-1\/\">Residential Renovation in AQUA 1<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>\u4e0d\u52d5\u7523\u4ef2\u4ecb\u306eN-ASSET\u69d8\u304b\u3089\u3054\u7d39\u4ecb\u3044\u305f\u3060\u3044\u305f\u30b3\u30f3\u30c9\u30df\u30cb\u30a2\u30e0\u306e\u30ea\u30ce\u30d9\u30fc\u30b7\u30e7\u30f3\u8a08This is one of our construction project case studies. The design was led by Professor Nakakura of Nakakura Architects &\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/04\/07<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>Renovation<\/p><p>Others<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/ovol-office-ja\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2025\/12\/R0005318-min-scaled.jpeg\" alt=\"Rapid Solutions for Office Relocation Risks in Vietnam: Japan Pulp &#038; Paper Clients\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/ovol-office-ja\/\">Rapid Solutions for Office Relocation Risks in Vietnam: Japan Pulp &#038; Paper Clients<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>The Risks of Unexpected Office Relocation in Vietnam The Ho Chi Minh City representative office of Japan Pulp & Paper\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/01\/19<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>\u30cd\u30c3\u30c8\u30ef\u30fc\u30af<\/p><p>\u30bb\u30ad\u30e5\u30ea\u30c6\u30a3<\/p><p>Office interior<\/p><p>Relocation<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/%e8%87%aa%e5%88%86%e3%81%9f%e3%81%a1%e3%81%93%e3%81%9d-%e3%81%84%e3%81%84%e3%82%aa%e3%83%95%e3%82%a3%e3%82%b9%e3%81%a7%e5%83%8d%e3%81%93%e3%81%86-craftec%e6%96%b0%e3%82%aa%e3%83%95%e3%82%a3%e3%82%b9\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2025\/12\/R0005228-min-scaled.jpeg\" alt=\"CRAFTEC New Office: Creating the Ideal Workspace for Our Team.\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/%e8%87%aa%e5%88%86%e3%81%9f%e3%81%a1%e3%81%93%e3%81%9d-%e3%81%84%e3%81%84%e3%82%aa%e3%83%95%e3%82%a3%e3%82%b9%e3%81%a7%e5%83%8d%e3%81%93%e3%81%86-craftec%e6%96%b0%e3%82%aa%e3%83%95%e3%82%a3%e3%82%b9\/\">CRAFTEC New Office: Creating the Ideal Workspace for Our Team.<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>Startup Growth: Reaching Our Office Limits Within a Year Our startup journey began in a 60m2 furnished office at the\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/01\/13<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>\u30bb\u30ad\u30e5\u30ea\u30c6\u30a3<\/p><p>\u30cd\u30c3\u30c8\u30ef\u30fc\u30af<\/p><p>Office interior<\/p><p>Relocation<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/asics-office-relocation-vietnam\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2025\/11\/R0003846-scaled.jpeg\" alt=\"ASICS Vietnam: B2B Showroom and Corporate Office Design\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/asics-office-relocation-vietnam\/\">ASICS Vietnam: B2B Showroom and Corporate Office Design<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>Located in Deutsches Haus, a Grade A building in District 1, Ho Chi Minh City, the new ASICS VIETNAM office\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/01\/13<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>\u30bb\u30ad\u30e5\u30ea\u30c6\u30a3<\/p><p>\u30cd\u30c3\u30c8\u30ef\u30fc\u30af<\/p><p>Office interior<\/p><p>Store interior<\/p><p>Relocation<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/pasona-vietnam-office-relocation\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2025\/12\/R0005271-min-scaled.jpeg\" alt=\"PASONA VIETNAM : A layout design that maximizes the characteristics of the space\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/pasona-vietnam-office-relocation\/\">PASONA VIETNAM : A layout design that maximizes the characteristics of the space<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>The selection of candidate properties began six months in advance. This was a relocation project from the VINCOM Center office\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/01\/13<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>Office interior<\/p><p>Relocation<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/dhg-new-office-nexus-building\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2025\/12\/R0005145-min-scaled.jpeg\" alt=\"DHG Moves Its Urban Office to the Top Floor of NEXUS\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/dhg-new-office-nexus-building\/\">DHG Moves Its Urban Office to the Top Floor of NEXUS<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>This was a plan to expand and relocate the office from The LANDMARK to the Japanese building, The Nexus. DHG\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2026\/01\/13<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>\u30cd\u30c3\u30c8\u30ef\u30fc\u30af<\/p><p>\u30bb\u30ad\u30e5\u30ea\u30c6\u30a3<\/p><p>Office interior<\/p><p>Relocation<\/p><p>Others<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"s2_col find_a\">\n                            <div class=\"s2_box\">\n                                <div class=\"s2_img\">\n                                    <p>\n                                        <a href=\"https:\/\/craftec.vn\/en\/case\/kobo-sapporo-office-relocation\/\">\n                                            <img decoding=\"async\" loading=\"lazy\" width=\"350\" height=\"262\" src=\"https:\/\/craftec.vn\/wp-content\/uploads\/2025\/12\/IMG_2534.jpg\" alt=\"KOBO Sapporo: Upgrading outdated office infrastructure through relocation.\">\n                                        <\/a>\n                                    <\/p>\n                                <\/div>\n                                <div class=\"s2_box_info\">\n                                    <div class=\"s2_ttl\">\n                                        <p><a href=\"https:\/\/craftec.vn\/en\/case\/kobo-sapporo-office-relocation\/\">KOBO Sapporo: Upgrading outdated office infrastructure through relocation.<\/a><\/p>\n                                    <\/div>\n                                    <div class=\"s2_desc\">\n                                        <p>The office as \u2018hardware\u2019 that had been left behind amid the transformation of work styles. As we developed the concept\u2026<\/p>\n                                    <\/div>\n                                    <div class=\"s2_date_cate\">\n                                        <div class=\"date\">\n                                            <p>2025\/12\/06<\/p>\n                                        <\/div>\n                                        <!-- fix  -->\n                                        <div class=\"cate\">\n                                            <p>Office interior<\/p><p>Relocation<\/p>                                        <\/div>\n                                        <!-- fix  -->\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                    <\/div>\n        <\/div>\n    <\/div>\n    <\/div>\n<\/div>\n<p class=\"btn center\"><a href=\"https:\/\/craftec.vn\/case\/\">List of projects<\/a><\/p>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Office recovery Whether office recovery is required during an office relocation has a significant impact on the overall timeline. In some cases, the building management designates a specific contractor for the restoration, while in others, tenants are allowed to choose their own. \uff11\uff09In case of carrying out by the building\u2019s designated contractor When the office [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":156,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_locale":"en_US","_original_post":"https:\/\/craftec.vn\/?page_id=1166","footnotes":""},"class_list":["post-1168","page","type-page","status-publish","hentry","en-US"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/pages\/1168","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/comments?post=1168"}],"version-history":[{"count":1,"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/pages\/1168\/revisions"}],"predecessor-version":[{"id":1170,"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/pages\/1168\/revisions\/1170"}],"up":[{"embeddable":true,"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/pages\/156"}],"wp:attachment":[{"href":"https:\/\/craftec.vn\/wp-json\/wp\/v2\/media?parent=1168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}